| 盖板生成原理 Cover generation principle 1、准备盖板模型一个,振动平台一台,混合好的混凝土适量。 1. Prepare a cover plate model, a vibration platform and a proper amount of mixed concrete. 2、将混合好的混凝土倒入水泥排水沟盖板塑料模型内,经振动平台振动30秒左右,去下置于阴凉避光的仓库之内。 2. Pour the mixed concrete into the plastic model of the cover plate of the cement drainage ditch, vibrate through the vibration platform for about 30 seconds, and put it in a cool and dark warehouse. 3、放置一定的时间大约24小时左右冬季一般放置2-3天。 3. It is generally placed for 2-3 days in winter for about 24 hours. 4、待混凝土凝固成型之后进行拆模或者脱模成型。 4. After the concrete is solidified and formed, the formwork shall be removed or demoulded. |